iTa'LeEm
SEM1 BLAR 3182 DERELICT AND RECLAMATION
0%
Previous
Course data
General
Announcements
Week 1: Introduction to Derelict Land
Individual Project SUBMISSION (40%)
Week 2: Contaminated Land and Site Investigation
Week 2 Slide: Site Investigation
Video 1: Bauxite Contamination
Video 2: Sydney TAR Pond
Website Reference: Sydney TAR Ponds
Activities: Trash to Treasure Notebook
Upload your notebook photo and video here
Week 3: Environmental Issues and Awareness
Assignment: Environmental Awareness Public Survey (20%)
Week 4: Restoration, Rehabilitation, Reclamation
Week 4: Restoration, Rehabilitation, Reclamation (Lecture)
Reading Material (Article)
Week 5: Brownfield Reclamation and Legislation
GARIS PANDUAN PENGENALPASTIAN BAGI PEMBANGUNAN SEMULA KAWASAN BROWNFIELD
Week 6: Issue GROUP ASSIGNMENT (40%): Case Study of Merdeka 118 Precinct Urban Infrastructure Revitalisation
PNB 118
Week 10: Reclamation of Landfill - Engineering Perspectives
Video Link: Reclamation of Landfill: An Engineering Perspective
Week 11 and 12: Presentation at PNB
Link to Presentation Slides and Videos for Merdeka 118 Project
Week 13: Phytoremediation
Video Link: Phytoremediation for Sustainable Land Restoration
Week 14: Landscape for People
Vid 1: The High Line History
Vid 2: The High Line Design
Vid 3: The High Line as a Public Space
Next
iTa'LeEm
Side panel
2022/2023 Academic Session
2021/2022 Academic Session
2020/2021 Academic Session
2019/2020 Academic Session
English (en)
Bahasa Melayu (ms)
English (en)
العربية (ar)
Log in
Course Navigation
BLAR 3182 SEM1
Site Navigation
Home
Skip to main content
Course info
Home
Courses
Session 2023/2024 Semester 1
ARCHITECTURE & ENVIRONMENTAL DESIGN
BLAR 3182 SEM1
Summary
SEM1 BLAR 3182 DERELICT AND RECLAMATION
Instructor:
KHALILAH BT. ZAKARIYA 4776
Skill Level
:
Beginner